Notice: Function _load_textdomain_just_in_time was called incorrectly. Translation loading for the wordpress-seo domain was triggered too early. This is usually an indicator for some code in the plugin or theme running too early. Translations should be loaded at the init action or later. Please see Debugging in WordPress for more information. (This message was added in version 6.7.0.) in /mnt/customers/customers-1xb2b8/customers-el-3543411-24514-prizmaengineering-wordpress-pvc-6244a9ad5ddac0001f2f29e6/wp-content/wp-includes/functions.php on line 6114 Material Flow Design Management - Prizma Engineering

Material Flow Design Management

An efficient flow from arrival at the factory as raw material to departure as ready products or components can reduce costs significantly. Whether it is the number of workers required to run the operations, the time they take to move the goods from one point to another, or the bottlenecks holding back production, it is critical to do things right.
We support many international factories regarding layout designs material flow and efficiency of production improvement.

M_OR2
IMG_20160827_013334
pIC1
Exstrusion Press 1 3 6 22